Epitaxie-Anlage EpiLab - PR237391-2610-W Referenznummer der Bekanntmachung: PR237391-2610-W
Auftragsbekanntmachung
Lieferauftrag
Abschnitt I: Öffentlicher Auftraggeber
Postanschrift:[gelöscht]
Ort: München
NUTS-Code: DE212 München, Kreisfreie Stadt
Postleitzahl: 80686
Land: Deutschland
E-Mail: [gelöscht]
Internet-Adresse(n):
Hauptadresse: https://vergabe.fraunhofer.de/
Abschnitt II: Gegenstand
Epitaxie-Anlage EpiLab - PR237391-2610-W
Epitaxie-Anlage EpiLab
Fraunhofer FEP
Winterbergstraße 28
01277 Dresden
Deutschland
1 piece
The Fraunhofer Institute for Organic Electronics, Electron Beam and Plasma Technology FEP (henceforth referred to as FEP) has a number of active projects related to magnetron sputter epitaxy. These projects are funded by government grants as well as internal grants of the Fraunhofer society. The common aim of these projects is to transfer magnetron sputter epitaxy from lab scale to an industrial production technology for semiconductor devices.
Magnetron sputter epitaxy is a novel technique that can be used to grow single crystal film stacks on large area silicon wafers. Such a process is in general referred to as epitaxy. Such single crystal film stacks are the basis of many optoelectronic and power electronic devices.
Currently the technological development is performed on an existing tool at the FEP. However, this tool is unable to achieve the high degree of film quality and process control required by the semiconductor industry. Moreover, the existing tool does not provide the flexibility for rapidly transferring process from the lab to an industrial scale. Thus, a new epitaxy tool will be procured from the successful bidder (henceforth referred to as capital equipment manufacturer) on this tender to complement the existing tool at the FEP and accelerate the development process.
Options:
4.3.1Cooling power of min. 2 kW at 253 K
4.3.2 Cooling fluid suitable for the magnetron sputtering sources offered as part of EpiLab (cf. section 4.1)
4.4.1Duration of 24 months
4.5.1Rated for class ISO 6 cleanroom
4.5.2 All components that will enter room EE014 (cf. section 1.6)
4.3.1 Cooling power of min. 2 kW at 253 K
4.3.2 Cooling fluid suitable for the magnetron sputtering sources offered as part of EpiLab (cf. section 4.1)
4.4.1 Duration of 24 months
4.5.1 Rated for class ISO 6 cleanroom
4.5.2 All components that will enter room EE014 (cf. section 1.6)
Das Projekt wird mit Haushaltsinternen Mitteln finanziert.
Abschnitt III: Rechtliche, wirtschaftliche, finanzielle und technische Angaben
Directlink to documents with Selection criteria: (URL) https://vergabe.fraunhofer.de/NetServer/SelectionCriteria/54321-Tender-1859bae617a-37ef78f2b35f02f6
Directlink to documents with Selection criteria: (URL) https://vergabe.fraunhofer.de/NetServer/SelectionCriteria/54321-Tender-1859bae617a-37ef78f2b35f02f6
Directlink to documents with Selection criteria: (URL) https://vergabe.fraunhofer.de/NetServer/SelectionCriteria/54321-Tender-1859bae617a-37ef78f2b35f02f6
In the event that subcontractors are used, they must be named and their suitability is likewise to be substantiated on the basis of the listed documents under III.1). Furthermore, it must be confirmed that they will be available if the order is placed; their share in the scope of the contractual object must be stated.
Abschnitt IV: Verfahren
not applicable
Abschnitt VI: Weitere Angaben
Postanschrift:[gelöscht]
Ort: Bonn
Postleitzahl: 53123
Land: Deutschland
A request for review is inadmissible if more than 15 calendar days have passed since the receipt of the notification from the ordering party indicating a lack of willingness to help with the objection (§160 Par. 3 Clause 1 No. 4 GWB [German Act Against Restraints of Competition]). A request for review is additionally inadmissible if the contract has been awarded before the Vergabekammer (procurement review authority) has informed the ordering party of the request for review (§§ 168 Par. 2 Clause 1, 169 Par. 1 GWB). The award of the contract is possible 15 calendar days after the dispatch of the tenderer information pursuant to § 134 Par. 1 GWB. If the information is sent electronically or via fax, this time period is reduced to ten calendar days (§ 134 Par. 2 GWB). The time period begins on the day after the dispatch of the information by the ordering party; the day on which it is received at the concerned tenderer and applicant is not relevant. The admissibility of a request for review furthermore presupposes that a complaint has been made to the ordering party with regard to the asserted procurement violations within 10 days after knowledge was obtained of it (§ 160 Par. 3 Clause 1 No. 1 GWB). Complaints regarding violations of procurement rules that are apparent on the basis of the announcement must be made to the ordering party before the expiration of the time period named in the announcement for the application or for the tendering (§ 160 Par. 3 Clause 1 No. 1 GWB). Complaints regarding violations of procurement rules that do not become apparent until appearing in the award documents must be made to the ordering party no later than by the expiration of the time period for the application or for the tendering (§ 160 Par. 3 Clause 1 No. 1 GWB).
Postanschrift:[gelöscht]
Ort: München
Postleitzahl: 80686
Land: Deutschland
E-Mail: [gelöscht]
Internet-Adresse: https://www.fraunhofer.de