Titel: 81304759 - Electric Load Management in the Jordanian Water Sector
Beschreibung: The production of renewable energy in Jordan has increased significantly in recent years. During the day, solar electricity already makes a significant contribution to the national electricity generation, while the peak times in the evening are almost completely covered by conventional plants powered by Natural Gas. However, the electricity sector currently lacks significant storage capacities. The increased penetration of RE led to instances where electricity production exceeds real-time electric demand resulting in voltage instability. Consequently, curtailment of variable energy resources has become necessary to address this challenge. Given the water sector's significance for the overall electricity consumption, water facilities are expected to provide great opportunities for grid balancing with electric load management (LM). Improving the operational flexibility of water facilities, mainly by adjusting electric consumption to align with the available electric supply, can pave the way for a more sustainable electrical system. This approach reduces reliance on polluting peaking power plants and facilitates the integration and the optimal utilization of renewable energy sources. Water facilities can participate in LM schemes by reducing or shifting their load from peak time to off-peak time or standard time. This proactive approach relieves electricity generation capacities, consequently reducing power generation costs. The adoption of Time-of-Use (ToU) tariffs, which involve varying electricity prices across different time slots, can create a win-win situation for the Jordanian energy and water sectors. Capturing LM opportunities not only contributes to financial gains for the water sector but also enhances overall operational efficiency of the electric system, contributing to a more cost-effective and efficient utilization of resources. Initiation of the discussion process on LM as well as analytic preparations and preliminary assessment have been already conducted in LM Phase 1, where a Contractor has worked on: - Generic assessment of water facilities regarding LM potential based on available data. - Analysing the potential applications of LM for 4 water systems - Providing a pre-feasibility study for 4 selected water systems The Energy and Minerals Regulatory Commission (EMRC), with the support of the World Bank, has conducted a study on the Electricity Cost of Service and Tariffs review, where recommendations have been made to vary electricity prices at different times of the day for all sectors including the water sector. This resulted in a ToU structure that can be used by the water sector. The Water Authority of Jordan (WAJ) with the support of the KfW Development Bank has conducted the following study "Dair Alla-Zay Energy-Cost saving measures" as part of the project "Feasibility Study: Use of Renewable Energy in the Water Sector", The Feasibility Study is embedded in the third phase of the KfW financed program "Energy Efficiency in the Water Sector". The study explored the opportunities for energy cost savings measures on the Zay-Dabouq Water Transmission System (WTS) under Package 1, Track 1 of Stage 1 of the feasibility study addendum "Use of Renewable Energy in the Water Sector". The study comprises the analysis of energy cost savings through three phases, where in the second phase the potential for Load Shifting on Zay Pumping Stations PS1 to PS5 was analysed, and the needed infrastructure, related investment cost and financial benefits through the application of new tariff were defined. The current assignment shall use the previous results of studies i.e., LM Phase 1, World Bank Study, KfW Study as basis for the work. GIZ acknowledges the different dimensions of Jordan"s water sector challenges. Consequently, German development cooperation will continue to offer support through short and medium-term oriented activities as well as long-term oriented measures aiming at efficient management of water resources to secure the future water supply of the country. The contractor is responsible for providing the following services: - Carry out a screening of water facilities for LM potential and investigation of no-cost and low-cost application of LM. - Elaboration of six techno-economic feasibility studies for investment LM application in the water sector for selected systems. - Development of a Road map for prioritized LM projects. - Carry out a generic assessment of LM for the water sector after the realization of the National Conveyor project and other strategic bulk water supply projects.
Kennung des Verfahrens: e7c63bc3-a6dd-4927-aed7-22a0b67fdf75
Interne Kennung: 81304759
Verfahrensart: Verhandlungsverfahren mit vorheriger Veröffentlichung eines Aufrufs zum Wettbewerb/Verhandlungsverfahren
2.1.1.
Zweck
Art des Auftrags: Dienstleistungen
Haupteinstufung (cpv): 71300000 Dienstleistungen von Ingenieurbüros
Zusätzliche Einstufung (cpv): 71314000 Dienstleistungen im Energiebereich
2.1.2.
Erfüllungsort
Stadt: Jordan
Postleitzahl: 00000
Land: Jordanien
Ort im betreffenden Land
2.1.4.
Allgemeine Informationen
Zusätzliche Informationen: Bekanntmachungs-ID: CXTRYY6Y1KMGYEB0 All communication takes place in English via communication tool in the project area of the procurement portal.
Rechtsgrundlage:
Richtlinie 2014/24/EU
vgv -
2.1.6.
Ausschlussgründe:
Der Zahlungsunfähigkeit vergleichbare Lage gemäß nationaler Rechtsvorschriften: Zwingende bzw. fakultative Ausschlussgründe nach §§ 123 bis 126 GWB
Konkurs: Zwingende bzw. fakultative Ausschlussgründe nach §§ 123 bis 126 GWB
Korruption: Zwingende bzw. fakultative Ausschlussgründe nach §§ 123 bis 126 GWB
Vergleichsverfahren: Zwingende bzw. fakultative Ausschlussgründe nach §§ 123 bis 126 GWB
Beteiligung an einer kriminellen Vereinigung: Zwingende bzw. fakultative Ausschlussgründe nach §§ 123 bis 126 GWB
Vereinbarungen mit anderen Wirtschaftsteilnehmern zur Verzerrung des Wettbewerbs: Zwingende bzw. fakultative Ausschlussgründe nach §§ 123 bis 126 GWB
Verstoß gegen umweltrechtliche Verpflichtungen: Zwingende bzw. fakultative Ausschlussgründe nach §§ 123 bis 126 GWB
Geldwäsche oder Terrorismusfinanzierung: Zwingende bzw. fakultative Ausschlussgründe nach §§ 123 bis 126 GWB
Betrugsbekämpfung: Zwingende bzw. fakultative Ausschlussgründe nach §§ 123 bis 126 GWB
Kinderarbeit und andere Formen des Menschenhandels: Zwingende bzw. fakultative Ausschlussgründe nach §§ 123 bis 126 GWB
Zahlungsunfähigkeit: Zwingende bzw. fakultative Ausschlussgründe nach §§ 123 bis 126 GWB
Verstoß gegen arbeitsrechtliche Verpflichtungen: Zwingende bzw. fakultative Ausschlussgründe nach §§ 123 bis 126 GWB
Verwaltung der Vermögenswerte durch einen Insolvenzverwalter: Zwingende bzw. fakultative Ausschlussgründe nach §§ 123 bis 126 GWB
Falsche Angaben, verweigerte Informationen, die nicht in der Lage sind, die erforderlichen Unterlagen vorzulegen, und haben vertrauliche Informationen über dieses Verfahren erhalten.: Zwingende bzw. fakultative Ausschlussgründe nach §§ 123 bis 126 GWB
Interessenkonflikt aufgrund seiner Teilnahme an dem Vergabeverfahren: Zwingende bzw. fakultative Ausschlussgründe nach §§ 123 bis 126 GWB
Direkte oder indirekte Beteiligung an der Vorbereitung des Vergabeverfahrens: Zwingende bzw. fakultative Ausschlussgründe nach §§ 123 bis 126 GWB
Schwere Verfehlung im Rahmen der beruflichen Tätigkeit: Zwingende bzw. fakultative Ausschlussgründe nach §§ 123 bis 126 GWB
Vorzeitige Beendigung, Schadensersatz oder andere vergleichbare Sanktionen: Zwingende bzw. fakultative Ausschlussgründe nach §§ 123 bis 126 GWB
Verstoß gegen sozialrechtliche Verpflichtungen: Zwingende bzw. fakultative Ausschlussgründe nach §§ 123 bis 126 GWB
Zahlung der Sozialversicherungsbeiträge: Zwingende bzw. fakultative Ausschlussgründe nach §§ 123 bis 126 GWB
Einstellung der gewerblichen Tätigkeit: Zwingende bzw. fakultative Ausschlussgründe nach §§ 123 bis 126 GWB
Entrichtung von Steuern: Zwingende bzw. fakultative Ausschlussgründe nach §§ 123 bis 126 GWB
Terroristische Straftaten oder Straftaten im Zusammenhang mit terroristischen Aktivitäten: Zwingende bzw. fakultative Ausschlussgründe nach §§ 123 bis 126 GWB
5. Los
5.1.
Los: LOT-0001
Titel: 81304759 - Electric Load Management in the Jordanian Water Sector
Beschreibung: Chronic water scarcity is one of the key obstacles to Jordan"s development. Efforts to reform the supply situation in recent years have been outweighed by the effects of a growing population and high demand. This rapid population growth, along with agricultural expansion and the impacts of global climate change, have increased the pressure on Jordan"s scarce water resources, which have been heavily overused for years. Also, energy costs for the water sector have increased with the costs of operation reaching more than 50 per cent of the water sector bill in 2021. Against this backdrop of growing demand from several directions for an increasingly scarce resource, the Jordanian government is very interested in harnessing the potential of Renewable Energy (RE) technologies and improving Energy Efficiency (EE) in the water sector to improve financial sustainability. The project aims to support Jordan"s water sector in improving its energy management by increasing en-ergy efficiency (EE) and its share of renewable energy (RE), thus moving faster towards the EE and RE policy tar-gets while also reducing the country"s high energy costs. It aims to achieve its goals by: - improving the skills of the staff and organisational capabilities in the water sector, - establishing and implementing a standardised Energy Management System (EnMS), - and enhancing the Nexus dialogue with the energy sector. The project combines energy-related, methodological and process consulting to develop measures that optimise Jordan"s energy management and to increase renewable energy deployment in selected operational units (multi-level and multi-stakeholder approaches) of the water sector. The relevant actors, i.e., the Water Authority of Jordan, the Ministry of Water and Irrigation, and the Water Utilities are given support to consolidate their respective roles and functions. Cooperation with the private sector is facilitated where feasible, e.g., as investors in EE/RE measures or as service providers, for instance through performance-based maintenance contracts. The project includes five major fields of action: 1. Energy Management System 2. Enhanced Energy Data 3. EE and RE Investments 4. Improved Operation 5. WEFE NEXUS Along with providing sustainable electricity and increasing the use of RE in the water sector, the project will help to mitigate climate change by directly reducing greenhouse gas emissions. The project also supports in improving the operations of the water utilities and internal planning and implementation processes towards higher EE. Furthermore, through effective EnMS, the water sector will be enabled to monitor and evaluate its performance for optimisation. The Energy Management System (EnMS) is being implemented in the Jordanian Water Sector since 2019 with the support of the project. This includes designing and implementing standardized processes and structures for the sector according to ISO 50001. The support of the project focuses on the application of the EnMS central elements, that support the water companies and thus the entire water sector in enhancing their energy performance and reducing the operational costs. This is achieved by increasing data reliability and utilisation, and by developing the technical and organisational capacities of water providers to help them take better decisions at the technical and managerial level. The cooperation between the water and energy sectors has improved and started specific projects and activities to improve the cost recovery of the water sector.
Interne Kennung: 81304759
5.1.1.
Zweck
Art des Auftrags: Dienstleistungen
Haupteinstufung (cpv): 71300000 Dienstleistungen von Ingenieurbüros
Zusätzliche Einstufung (cpv): 71314000 Dienstleistungen im Energiebereich
5.1.2.
Erfüllungsort
Stadt: Jordan
Postleitzahl: 00000
Land: Jordanien
Ort im betreffenden Land
5.1.4.
Verlängerung
Maximale Verlängerungen: 2
Der Erwerber behält sich das Recht vor, zusätzliche Käufe vom Auftragnehmer zu tätigen, wie hier beschrieben: GIZ may optionally commission contract amendments and/or increases based on the criteria in the tender documents to the successful bidder of this tender. For details, please see the terms of reference.
5.1.6.
Allgemeine Informationen
Die Namen und beruflichen Qualifikationen des zur Auftragsausführung eingesetzten Personals sind anzugeben: Noch nicht bekannt
Auftragsvergabeprojekt nicht aus EU-Mitteln finanziert
Die Beschaffung fällt unter das Übereinkommen über das öffentliche Beschaffungswesen
5.1.7.
Strategische Auftragsvergabe
Ziel der strategischen Auftragsvergabe: Keine strategische Beschaffung
5.1.9.
Eignungskriterien
Kriterium:
Art: Wirtschaftliche und finanzielle Leistungsfähigkeit
Bezeichnung: Wirtschaftliche und finanzielle Leistungsfähigkeit
Beschreibung: 1. Average annual turnover for the last three years (last-but-four financial year can be included in case of tenders held within 6 months of end of last financial year), at least: 1000.000,00 EUR 2. Average number of employees and managers in the last three calendar years, at least 10 persons
Kriterium:
Art: Sonstiges
Bezeichnung: Sonstiges
Beschreibung: If we receive more than 5 requests to participate, we will make a selection on the basis of the criteria laid out in the procurement documents and invite tenders only from the 5 candidates with the highest scores. Weighted criteria for the selection of the 5 candidates: 1. Technical experience 1) Electric Load Management in large scale facilities (40 %) 2) Electric Load Management in large scale water supply systems (20 %) 3) Conducting techncial and financial feasibility studies in the water sector (20 %) 4) Development and implementation of projects concerning energy efficiency in the water sector (20 %) 2. Regional experience in World (0%)
Kriterium:
Art: Eignung zur Berufsausübung
Bezeichnung: Eignung zur Berufsausübung
Beschreibung: 1. Self-declaration: name of company and address, tax ID, registration and commercial register number or equivalent register in accordance with the legal provisions of the country of origin. 2. No grounds for exclusion pursuant to § 123, § 124 GWB, § 22 LkSG 3. Declaration of bidding consortium and/or declaration of subcontractors (if applicable)
Kriterium:
Art: Technische und berufliche Leistungsfähigkeit
Bezeichnung: Technische und berufliche Leistungsfähigkeit
Beschreibung: 1. The technical assessment is only based on reference projects with a minimum commission value of 200.000,00 EUR. 2. At least 1 reference projects in the technical field of Electric Load Management in large scale facilities and at least 0 reference projects in World in the last 3 years.
5.1.11.
Auftragsunterlagen
Sprachen, in denen die Auftragsunterlagen offiziell verfügbar sind:
Frist für die Anforderung zusätzlicher Informationen: 04/03/2024 23:59:00 (UTC+1)
Ad-hoc-Kommunikationskanal:
5.1.12.
Bedingungen für die Auftragsvergabe
Bedingungen für die Einreichung:
Elektronische Einreichung: Erforderlich
Sprachen, in denen Angebote oder Teilnahmeanträge eingereicht werden können: Englisch
Elektronischer Katalog: Nicht zulässig
Varianten: Nicht zulässig
Frist für den Eingang der Teilnahmeanträge: 18/03/2024 12:00:00 (UTC+1)
Frist, bis zu der das Angebot gültig sein muss: 105 $name_timeperiod.DAYS_deu
Informationen, die nach Ablauf der Einreichungsfrist ergänzt werden können:
Nach Ermessen des Käufers können einige fehlenden Bieterunterlagen nach Fristablauf nachgereicht werden.
Zusätzliche Informationen: GIZ asks the applicant or bidder to submit, complete or correct documents, within the framework laid down by law.
Auftragsbedingungen:
Bedingungen für die Ausführung des Auftrags: The execution conditions result from the information given in the contract notice and the tender documents.
Elektronische Rechnungsstellung: Erforderlich
Informationen über die Überprüfungsfristen: According to Article 160, Section 3 of the German Act Against Restraint of Competition (GWB), application for review is not permissible insofar as 1. the applicant has identified the claimed infringement of the procurement rules before submitting the application for review and has not submitted a complaint to the contracting authority within a period of 10 calendar days; the expiry of the period pursuant to Article 134, Section 2 remains unaffected, 2. complaints of infringements of procurement rules that are evident in the tender notice are not submitted to the contracting authority at the latest by the expiry of the deadline for the application or by the deadline for the submission of bids, specified in the tender notice. 3. complaints of infringements of procurement rules that first become evident in the tender documents are not submitted to the contracting authority at the latest by the expiry of the deadline for application or by the deadline for the submission of bids, 4. more than 15 calendar days have expired since receipt of notification from the contracting authority that it is unwilling to redress the complaint. Sentence 1 does not apply in the case of an application to determine the invalidity of the contract in accordance with Article 135, Section 1 (2). Article 134, Section 1, Sentence 2 remains unaffected.
5.1.15.
Techniken
Rahmenvereinbarung: Keine Rahmenvereinbarung
Informationen über das dynamische Beschaffungssystem: Kein dynamisches Beschaffungssystem
5.1.16.
Weitere Informationen, Schlichtung und Nachprüfung
Überprüfungsstelle: Die Vergabekammern des Bundes
Organisation, die zusätzliche Informationen über das Vergabeverfahren bereitstellt: Deutsche Gesellschaft für Internationale Zusammenarbeit (GIZ) GmbH
Organisation, die Teilnahmeanträge entgegennimmt: Deutsche Gesellschaft für Internationale Zusammenarbeit (GIZ) GmbH
8. Organisationen
8.1.
ORG-0001
Offizielle Bezeichnung: Deutsche Gesellschaft für Internationale Zusammenarbeit (GIZ) GmbH
Registrierungsnummer: 993-80072-52
Postanschrift: Dag-Hammarskjöld-Weg 1 - 5
Stadt: Eschborn
Postleitzahl: 65760
Land, Gliederung (NUTS): Main-Taunus-Kreis (DE71A)
Land: Deutschland
Telefon: +49 6196793400
Rollen dieser Organisation:
Beschaffer
8.1.
ORG-0002
Offizielle Bezeichnung: Deutsche Gesellschaft für Internationale Zusammenarbeit (GIZ) GmbH
Registrierungsnummer: 993-80072-52
Postanschrift: Dag-Hammarskjöld-Weg 1 - 5
Stadt: Eschborn
Postleitzahl: 65760
Land, Gliederung (NUTS): Main-Taunus-Kreis (DE71A)
Land: Deutschland
Telefon: +49 6196793400
Rollen dieser Organisation:
Organisation, die zusätzliche Informationen über das Vergabeverfahren bereitstellt
8.1.
ORG-0003
Offizielle Bezeichnung: Die Vergabekammern des Bundes
Registrierungsnummer: 022894990
Postanschrift: Villemombler Straße 76
Stadt: Bonn
Postleitzahl: 53123
Land, Gliederung (NUTS): Bonn, Kreisfreie Stadt (DEA22)
Land: Deutschland
Telefon: +49 2289499-0
Fax: +49 2289499-163
Rollen dieser Organisation:
Überprüfungsstelle
8.1.
ORG-0004
Offizielle Bezeichnung: Deutsche Gesellschaft für Internationale Zusammenarbeit (GIZ) GmbH
Registrierungsnummer: 993-80072-52
Postanschrift: Dag-Hammarskjöld-Weg 1 - 5
Stadt: Eschborn
Postleitzahl: 65760
Land, Gliederung (NUTS): Main-Taunus-Kreis (DE71A)
Land: Deutschland
Telefon: +49 6196793400
Rollen dieser Organisation:
Organisation, die Teilnahmeanträge entgegennimmt
8.1.
ORG-0005
Offizielle Bezeichnung: Beschaffungsamt des BMI
Registrierungsnummer: 994-DOEVD-83
Stadt: Bonn
Postleitzahl: 53119
Land, Gliederung (NUTS): Bonn, Kreisfreie Stadt (DEA22)
Land: Deutschland
Telefon: +49228996100
Rollen dieser Organisation:
TED eSender
11. Informationen zur Bekanntmachung
11.1.
Informationen zur Bekanntmachung
Kennung/Fassung der Bekanntmachung: faa1c1f8-699d-4d95-9ca1-3edf6b67dce3 - 01
Formulartyp: Wettbewerb
Art der Bekanntmachung: Auftrags- oder Konzessionsbekanntmachung – Standardregelung
Datum der Übermittlung der Bekanntmachung: 14/02/2024 13:19:54 (UTC+1)
Sprachen, in denen diese Bekanntmachung offiziell verfügbar ist: Englisch
11.2.
Informationen zur Veröffentlichung
Veröffentlichungsnummer der Bekanntmachung: 96202-2024
ABl. S – Nummer der Ausgabe: 33/2024
Datum der Veröffentlichung: 15/02/2024