Beschreibung: The Deutsche Gesellschaft für Internationale Zusammenarbeit (GIZ) GmbH is currently
                                             implementing the project Waste to Positive Energy / Sludge Management in Zaatari and
                                             Azraq Refugee Camp (SMZA) in Jordan. As part of this project GIZ intends to award
                                             a contract for the Design, Construction, Commissioning, and Operation (optional) of
                                             Sludge Management Facility in Zaatari Refugee Camp - Consisting of Sludge Pretreatment
                                             and Gravity Thickening, Mechanical Sludge Dewatering, Treatment of Backload Liquors
                                             and Greenhouse Solar Sludge Drying The scope of work includes the following: 1) The
                                             Contractor shall in general fulfill all the duties of the "Contractor" as specified
                                             in the FIDIC Conditions of Contract for Plant, Design and Build (Yellow Book) for
                                             the system detailed design, construction, testing, and commissioning. The Contractor
                                             shall prepare a detailed design based on the conceptual/functional design prepared
                                             by the project Consultant which shall ensure that the sludge treatment facility meets
                                             the design criteria. Moreover, the tender documents prepared by the project Consultant
                                             will include, but not limited to: design criteria, Employer"s requirements, technical
                                             specifications, and drawings. 2) The Works to be designed by the Contractor shall
                                             be capable of processing the incoming (received) sludge flows presented in the table
                                             below: 1. Septic tank sludge Septic sludge from PRC septic tanks and emergency tanks
                                             of sewerage pumping stations of Za'atari Refugee Camp (typical 2-6% DS) Annual sludge
                                             flow (Parameter) | m3/a (Unit) | 18,250 at 3.8% DS (Design Value) Average daily sludge
                                             flow (Parameter) | m3/d (Unit) | 50 at 3.8% DS (Design Value) Maximum daily sludge
                                             flow (Parameter) | m3/d (Unit) | 182 at 3.8% DS (Design Value) 2. WWTP sludge Septic
                                             sludge from PRC septic tanks and emergency tanks of sewerage pumping stations of Za'atari
                                             Refugee Camp (typical 2-6% DS) Annual sludge flow (Parameter) | m3/a (Unit) |63,510
                                             at 1.5% DS (Design Value) Average daily sludge flow (Parameter) | m3/d (Unit) |174
                                             at 1.5% DS (Design Value) Maximum daily sludge flow (Parameter) | m3/d (Unit) | 261
                                             at 1.0% DS (Design Value) 3) The required sludge treatment works are as follows include
                                             all associated civil works, mechanical and electrical works: - WWTP Sludge Transfer
                                             Stations- two (2) sludge pumping stations provided for transferring WWTP sludge from
                                             the existing sludge storage tanks of Za'atari WWTP to the Sludge Pre-treatment Station
                                             - Tanker Unloading Point- two (2) unloading points provided for reception of septic
                                             tank sludge delivered by sludge tankers - Sludge Pre-Treatment Station - including
                                             screen and grit removal chamber for pre-treatment of all received sludge. - Sludge
                                             Equalization Tank- one (1) no. tank provided for buffering, homogenization and thickening
                                             of pre-treated sludge. - Thickened Sludge Pumping Station- for transfer of sludge
                                             from the Sludge Equalization Tank to the Dewatering Feed Tank - Dewatering Feed Tank-
                                             for supplying a batch of consistent quality feed sludge to the Sludge Dewatering Plant
                                             - Sludge Dewatering Plant -including 2 no. mechanical dewatering machines and polymer
                                             preparation units for dewatering of sludge to greater than 20% DS. - Lime Dosing Plant-
                                             Including lime storage silo and lime/sludge cake mixing for sludge pasteurisation.
                                             - Sludge Drying Plant- three (3) no. Climate-controlled solar drying halls (greenhouse)
                                             provided for drying dewatered sludge cake up to 85% DS dried sludge all year round.
                                             - Supernatant Pumping Station- for pumping of all process drainage (sludge liquors,
                                             domestic WW, overflows, etc.) to the Backload WWTP - Backload Wastewater Treatment
                                             Plant - Wastewater treatment process provided for treating process drainage to meet
                                             regulatory effluent requirements, including chemical dosing and disinfection. - Blower
                                             Station - for supply of pressurized air to grit chamber and Backload WWTP - Service
                                             Water Pumping Station - for pumping of effluent of Backload WWTP for reuse as service
                                             water within the sludge treatment facility e.g., for polymer post-diluting, etc. -
                                             Potable Water Storage and Pumping Station- for reception, storage, and pumping of
                                             potable water necessary for process and non-process consumption at the site. - Odour
                                             Control Unit - for treating odour extracted from covered process units. - General
                                             facilities such as: o The operation building comprises a furnished office, laboratory,
                                             rest room/kitchen, showers and toilets, workshop, storeroom, electrical room, generator
                                             room. o Transformer station (outdoor installed on concrete and fenced) o Process control
                                             system for monitoring and control of the processes throughout the sludge treatment
                                             facility and SCADA system o Access road and access paths within the plant area and
                                             parking lots o Outdoor lighting o Operation vehicles o Landscaping o Rainwater drainage
                                             system o Firefighting system 4) The Contractor shall provide an optional service for
                                             full operation and maintenance of the Works for a one (1) year Operation service period
                                             commencing after the handover certificate is issued and running concurrently with
                                             the defect notification period (DNP).