SC_wire Referenznummer der Bekanntmachung: 27/2600000882/20FAIR
Bekanntmachung vergebener Aufträge
Ergebnisse des Vergabeverfahrens
Lieferauftrag
Abschnitt I: Öffentlicher Auftraggeber
Postanschrift:[gelöscht]
Ort: Darmstadt
NUTS-Code: DE711 Darmstadt, Kreisfreie Stadt
Postleitzahl: 64291
Land: Deutschland
E-Mail: [gelöscht]
Telefon: [gelöscht]
Fax: [gelöscht]
Internet-Adresse(n):
Hauptadresse: http://www.fair-center.de
Abschnitt II: Gegenstand
SC_wire
Fast ramped superconducting magnets will be used for the SIS100 synchrotron
of FAIR. The low-loss superconducting strand needed to build the coils of these
magnets and Fast ramped superconducting corrector magnets as for example multipole correctors, chromaticity sextupoles and steering magnets are needed for the SIS100 synchrotron of FAIR. The insulated low-loss superconducting strand is needed to build the coils of these magnets.
FAIR - Facility for Antiproton and Ion Research in Europe GmbH Planckstr. 1 64291 Darmstadt
Production and Delivery of 380km Superconducting Strand for Main Magnets and 200km Superconducting Strand for Corrector Magnets according to the specifications.
Abschnitt IV: Verfahren
Abschnitt V: Auftragsvergabe
Auftragsvergabe Luvata Pori Oy
Postanschrift:[gelöscht]
Ort: Pori
NUTS-Code: FI195 Pohjanmaa
Postleitzahl: 28330
Land: Finnland
E-Mail: [gelöscht]
Telefon: [gelöscht]
Internet-Adresse: http://www.luvata.com
Abschnitt VI: Weitere Angaben
Bekanntmachungs-ID: CXS0YYEY1R89RMMX
Postanschrift:[gelöscht]
Ort: Bonn
Postleitzahl: 53123
Land: Deutschland
The competent reviewing authority is
Federal Public Procurement Tribunal
Villemombler Straße 76
53123 Bonn
Tel.: 0228 9499-0
Fax: 02[gelöscht]
Email: [gelöscht]
Website: http://www.bundeskartellamt.de
Candidate/ Bidder is requested to clearly identify those sections of the tender that contain a trade or business secret. If Bidder fails to do so, the Public Procurement Tribunal may, in the case of a review procedure, assume that Bidder has agreed to have these documents inspected (§165 para. 3 GWB). As Awarding Authority, FAIR is obliged to make the tender file available to the Public Procurement Tribunal immediately when initiating a review procedure (§ 163 para. 2 cl. 3 GWB).
Candidates/ Bidders have a right to expect the contracting authority's compliance with the Bidder-protecting provisions re: the tender procedure (§ 97 para. 6 GWB). If Candidate/ Bidder interested in the contract considers that Bidder's rights have been infringed through failure to comply with award regulations, the infringement must be reported to FAIR within ten calendar days (§ 160 para. 3 cl. 1 no. 1 GWB).
Infringements identifiable on the basis of the announcement or the award documents must be asserted against FAIR within the deadline for submission of ten-ders specified in the announcement (§ 160 para. 3 cl. 1 nr. 2 - 3 GWB).
If FAIR informs Candidate/ Bidder that FAIR is unwilling to redress its complaint, it is possible to file an appeal for review with the aforementioned Public Procurement Tribunal within 15 days of receipt of the notification (§ 160 para. 3 cl. 1 no. 4 GWB).
Bidders whose tenders are not to be considered for the award will be informed prior to the award according to § 134 GWB. A contract may only be concluded 15 calendar days after this information has been sent by FAIR. In the case of trans-mission by fax or electronic means, this period shall be ten calendar days. It commences on the day after dispatch of the information by FAIR. After this period has expired, a surcharge is possible, even if the deadline is not passed according to § 160 para. 3 GWB. An application for review would therefore have to be delivered to FAIR by the Public Procurement Tribunal before the expiry of the deadline according to § 134 GWB in order to prevent a surcharge.
According to § 135 para. 1 and 2 GWB, the ineffectiveness of a commission can only be established if it has been asserted in the review procedure within 30 calendar days of the conclusion of the contract but not later than six months after the conclusion of the contract. If the contracting entity has published the award in Official Journal of the European Union, the period unenforceability shall end 30 calendar days after announce-ment of the publication of the award in the Official Journal of the European Union.