Plasma furnace plant Referenznummer der Bekanntmachung: EUOV2114
Auftragsbekanntmachung
Lieferauftrag
Abschnitt I: Öffentlicher Auftraggeber
Postanschrift:[gelöscht]
Ort: Dresden
NUTS-Code: DED21 Dresden, Kreisfreie Stadt
Postleitzahl: 01328
Land: Deutschland
Kontaktstelle(n):[gelöscht]
E-Mail: [gelöscht]
Internet-Adresse(n):
Hauptadresse: www.hzdr.de
Abschnitt II: Gegenstand
Plasma furnace plant
The plasma furnace plant will be used for research on the reduction, refining and valorisation of slags and other waste products from metallurgical processes as well as for the treatment primary ores and concentrates.
Helmholtz-Institut Freiberg des HDZR
Building F110 Hall 030
Chemnitzer Straße 40
09599 Freiberg
Deutschland/Germany
The contractor is responsible for engineering, building, delivery, installation and commissioning of the plasma furnace plant as well as the instruction and training of operatives (customer’s staff).
Experiments in the plant will typically last three or four days and consists of following steps:
• controlled heating up the furnace plant with a temperature increase over time that will minimize damage of the refractory lining
• introducing material via a granule feeder station
• intermittently tapping of metal and slag phase
• emptying the furnace by a final tapping
• cooling down the furnace with a temperature decrease over time that will minimize damage of the refractory lining
Typical materials that will be treated in the furnace plant are:
• electric arc furnace slags and dusts
• waelz process’ slags
• copper converter and nickel-copper converter slags
• ferronickel slags
• refractory linings of smelting furnaces
The plasma furnace plant has to be controlled and monitored by a Process Logic Control (PLC) with a human machine interface (HMI).
Fully detailed requirements and evaluation criteria are listed in the tender documents.
Abschnitt III: Rechtliche, wirtschaftliche, finanzielle und technische Angaben
The HZDR will only consider suitable, that is, qualified and capable companies as potential suppliers, which are not excluded on the basis of the exclusion criteria as per Sections 123, 124 GWB.
Abschnitt IV: Verfahren
entfällt
Abschnitt VI: Weitere Angaben
Postanschrift:[gelöscht]
Ort: Bonn
Postleitzahl: 53123
Land: Deutschland
Fax: [gelöscht]
Appeals pursuant to Section 160 GWB:
(1) The Procurement Chamber shall initiate review proceedings only upon application,
(2) Any enterprise having an interest in the public contract or concession and claiming a violation of its rights pursuant to Section 97 (6) GWB due to non-compliance with procurement rules shall be entitled to file an application. In doing so, it must be shown that the company has suffered or is threatened with suffering damage as a result of the alleged violation of the procurement regulations,
(3) The application is inadmissible insofar as:
1) the applicant has recognized the alleged violation of procurement regulations prior to submission of the application for review and has not notified the contracting entity thereof within a period of 10 calendar days; the expiry of the period pursuant to Section 134 (2) GWB shall remain unaffected,
2) violations of procurement regulations, which are recognizable on the basis of the announcement, are not reprimanded to the contracting entity at the latest by the expiry of the deadline for application or submission of bids specified in the announcement,
3) violations of procurement regulations, which are only apparent in the tender documents, are not notified to the contracting entity not later than by the expiry of the deadline for application or submission of tenders,
4) more than 15 calendar days have elapsed since receipt of the notice from the contracting entity that it does not intend to remedy a complaint.
Sentence 1 shall not apply in the case of an application for a declaration of invalidity of the contract pursuant to Section 135 (1) No. 2. Section 134 (1) Sentence 2 shall remain unaffected.
Postanschrift:[gelöscht]
Ort: Bonn
Postleitzahl: 53123
Land: Deutschland
Fax: [gelöscht]