Online Analysers based on X-ray fluorescence
Delivery of two identical in construction and operational Online Analysers based on X-ray fluorescence to automatically measure the concentrations of all elements with atomic numbers between Silicon and Bismut in liquids.
Helmholtz-Zentrum Dresden - Rossendorf e.V.
Gebäude F110
Chemnitzer Straße 40
09599 Freiberg, Germany
The machine will be used to analyse various process solutions, which could be organic or aqueous matrices, in a multipurpose research plant. Up to 10 elements of interest, which the customer can select before each run, have to be analysed. The measured concentrations of the selected elements have to displayed on a screen and have to be published via OPC-UA.
The flow of the process liquids has to be controlled and guided by a liquid processing system, that is run by a separate, second Process Logic Control.
Process liquids should be sucked into the analyser via one of three Reactor Suction Probes. Flow rate (FC), temperature (TC) and pressure (PC) are measured. If FC, TC and PC are within an acceptable region, the solution is either unfiltrated or filtrated and will the enter the measuring cell.
The filtering system consists of two identical crossflow filters. Liquid is only sent through one filter at one time. The liquid that passes through the filter will be called permeate, the liquid that is used for purging the filter is called retentate. The pressure drop over the filter is to be monitored, if pressure drop is above a certain threshold, it indicates a clogged filter, then the system should automatically switch to the other, clean filter.
The liquid that passes through the measuring cell (either unfiltrated or permeate) as well as the retentate should be sent to one of the outlets, which are as follows
• back to one of the three Reactor Return Probes
• to a sampler port
• to a waste tank
After the measurement is finished, in certain cases flushing of the system is necessary (for example if the system first measured liquids from Reactor Suction Probe 1 and for the next measurement is to liquids from Reactor Suction Probe 2 should be analysed). To flush the system, the following steps have to be performed:
• remove liquids out of the filled lines with compressed air to one of the three outlets
• fill suction pump with new liquid, the liquid that has been in the pump until that point in time is sent either to outlet waste tank or to one of the three Reactor Return Probes
• flushing the respective lines with flushing agent to outlet waste tank
• removing flushing agent out of the respective lines with compressed air to waste tank
• system is clean and ready for next measurement
To calibrate the analyser, a calibration routine has to be provided. The calibration routine should work as follows:
• two to x calibration points per element
• experiment/process-specific calibration liquid is prepared by user
• calibration solution is sucked into Calibration Probe and enters the measuring cell
• user inputs concentrations of the relevant elements in the calibration solutions into the process logic control
A quality control solution is used to check performance and accuracy of the system in user specified intervals.
• experiment/process-specific quality control solution is prepared by user and filled into Quality Control Solution Tank
• quality control is pumped through the measuring cell
Future upgrading option: While the offered system should include three Reactor Suction Probes and three Reactor Return Probes, the system also has to be retrofittable easily to total of 10 Reactor Suction Probes and Reactor Return Probes each without installing new I/O-modules to the PLC in the future. For this upgrade/retrofit space has to be reserved in fluid processing compartment for the additional valves and tubing. This upgrade/retrofit has to be installable by customer without need of physical presence of technical personnel of supplier of the online analyser.
EFRE 100234297
Abschnitt III: Rechtliche, wirtschaftliche, finanzielle und technische Angaben
The HZDR will only consider suitable, that is, qualified and capable companies as potential suppliers, which are not excluded on the basis of the exclusion criteria as per Sections 123, 124 GWB.
Abschnitt IV: Verfahren
entfällt
Abschnitt VI: Weitere Angaben
Ort: Leipzig
Land: Deutschland
Appeals pursuant to Section 160 GWB:
(1) The Procurement Chamber shall initiate review proceedings only upon application,
(2) Any enterprise having an interest in the public contract or concession and claiming a violation of its rights pursuant to Section 97 (6) GWB due to non-compliance with procurement rules shall be entitled to file an application. In doing so, it must be shown that the company has suffered or is threatened with suffering damage as a result of the alleged violation of the procurement regulations,
(3) The application is inadmissible insofar as:
1) the applicant has recognized the alleged violation of procurement regulations prior to submission of the application for review and has not notified the contracting entity thereof within a period of 10 calendar days; the expiry of the period pursuant to Section 134 (2) GWB shall remain unaffected,
2) violations of procurement regulations, which are recognizable on the basis of the announcement, are not reprimanded to the contracting entity at the latest by the expiry of the deadline for application or submission of bids specified in the announcement,
3) violations of procurement regulations, which are only apparent in the tender documents, are not notified to the contracting entity not later than by the expiry of the deadline for application or submission of tenders,
4) more than 15 calendar days have elapsed since receipt of the notice from the contracting entity that it does not intend to remedy a complaint.
Sentence 1 shall not apply in the case of an application for a declaration of invalidity of the contract pursuant to Section 135 (1) No. 2. Section 134 (1) Sentence 2 shall remain unaffected.
Postanschrift:[gelöscht]
Ort: Bonn
Postleitzahl: 53123
Land: Deutschland
Telefon: [gelöscht]
Fax: [gelöscht]