Subsea HDD Crossings – Nord Stream 1 and 2
Auftragsbekanntmachung
Bauauftrag
Abschnitt I: Öffentlicher Auftraggeber
Nationale Identifikationsnummer: HRB 108780 B
Postanschrift:[gelöscht]
Ort: Berlin
NUTS-Code: DE300 Berlin
Postleitzahl: 10557
Land: Deutschland
Kontaktstelle(n):[gelöscht]
E-Mail: [gelöscht]
Internet-Adresse(n):
Hauptadresse: www.50hertz.com
Abschnitt II: Gegenstand
Subsea HDD Crossings – Nord Stream 1 and 2
Planning and drilling of up to two HDD crossings of the Nord Stream 1 and 2 Pipelines:
One crossing is considered as the “base case” with a second considered as optional scope. Which crossing will be considered as "base case" and which as "optional" is not decided yet. It will be decided on the base case during the negotiated procedure, prior to final bid submission. The full scope includes pilot hole drilling, reaming and cleaning as well as welding, float out and pull-in of HDPE pipe.
Baltic Sea (Vorpommern-Greifswald)
Detailed design and execution planning (Ausführungsplanung) of both crossings of the Nord Stream Pipelines by HDD method to accommodate the OST-1-4 HV cable system.
Design and installation of steel casings at entry and exit pits.
Supply, stringing, welding and testing of HDPE duct sections as well as handling of the same between onshore and offshore crossing locations prior to installation into HDD boreholes. This includes associated marine support and sub-sea activities / operations.
Drilling of one approx. 310.0m (with 50m tail string over length at entry and exit point) HDD borehole to cross the Nord Stream 1 Pipeline and a second approx. 310.0m (with 50m tail string over length at entry and exit point) HDD borehole to cross the Nord Stream 2 Pipeline. This includes pilot hole drilling, borehole reaming, borehole cleaning as required including pipe pull-in, grout filling between pipe and borehole wall and drilling fluid management. The 50m tail string should include dredging of the area and marking of the tail string HDPE with a buoy. One crossing is base case and second is optional.
Post installation cleaning, testing and calibration, CCTV inspection and gyroscopic survey of the installed HDD landfall duct section including installation of messenger wire and sealing of both ends.
If applicable, will be described in tenders documents.
Abschnitt III: Rechtliche, wirtschaftliche, finanzielle und technische Angaben
No grounds for exclusion specified in §§ 123, 124 GWB. Compliance with statutory minimum wage and language principles.
Paid wages must be compliant with the statutory minimum wage or collectively agreed remuneration regulations are obeyed, where applicable.
Pursuant to the provisions of Directive 2014/25/EU, Contracting Entity reserves the right to reject candidates who engage in the following practices: (1) child labour or other forms of human trafficking and (2) activities related to terrorism or the funding thereof.
Further details are included in the Selection Questionnaire: https://eliagroup.sharepoint.com/:f:/s/Filebox/Ehhy0co8qOxDgTtduSUkFaIBNV_mu8uVgwv2M9GH-PLVPQ?e=Ry5VsZ
A financial report dated of maximum 3 months from an independent credit rating company xto be provided (Credit Safe, Dun & Bradstreet, Graydon or equivalent)
A PowerPoint presentation of the company
An organization chart showing the main Business Units
A Short company presentation (+/- ½ page)
Further details are included in the Selection Questionnaire: https://eliagroup.sharepoint.com/:f:/s/Filebox/Ehhy0co8qOxDgTtduSUkFaIBNV_mu8uVgwv2M9GH-PLVPQ?e=Ry5VsZ
Companies with SubSea HDD experience (“must have”).
Experience of combined drilling activities along with marine work experience.
Reference of self-conducted landing or offshore project using HDD technology with a minimum length of 300m and a minimum pipe OD of 250mm.
Reference of self-conducted project / or with specialised subcontractor or partner for HDD landfall or offshore project involving the use of vessels to support HDD activities in shallow water.
Further details are included in the Selection Questionnaire: https://eliagroup.sharepoint.com/:f:/s/Filebox/Ehhy0co8qOxDgTtduSUkFaIBNV_mu8uVgwv2M9GH-PLVPQ?e=Ry5VsZ
Abschnitt IV: Verfahren
Abschnitt VI: Weitere Angaben
The non-confidential part of the tender package is directly available to applicants via the weblink mentioned under section I.3) of the contract notice.
Access to the confidential part of the tender package will be granted to the selected candidates as further set out in the invitation to tender (ITT).
Information to access the tender on the Ariba platform will be provided by e-mail as soon as possible. Applicants are advised to request this access as soon as possible and to click on ‘intend to participate’ in Ariba in order to receive possible clarifications from the contracting entity. The applicant must request, complete and submit by the closing date (see IV.2.2.) the selection questionnaire (SQ) with the most current available data together with the requested documents. Contracting entity doesn’t guarantee to provide the Ariba login details before closing time for candidates requesting their access to Ariba less than 48 hours before closing time.The applicant is solely responsible for requesting the access to the tender on the Ariba platform on time.The contracting entity declines any responsibility in the event of problems with the Ariba platform. Any application not sent correctly via Ariba will be rejected. The manuals for usage of E-Sourcing (Ariba) can be found via the following URL: http://www.elia.be/en/suppliers/information-and-tools-for-suppliers#ariba
Ort: Berlin
Postleitzahl: 10825
Land: Deutschland
The application for review proceedings before the public procurement tribunal is inadmissible if:
1) The applicant became aware of the claimed violation of public procurement provisions before filing the application for review, but did not complain to the contracting authority within a time limit of 10 calendar days; the expiry of the time limit under § 134 (2) GWB remains unaffected;
2) Violations of public procurement provisions which become apparent from the tender notice are not notified to the contracting authority by the end of the time limit for the application or the submission of a tender specified in the notice;
3) Violations of public procurement provisions which only become apparent from the procurement documents are not notified to the contracting authority by the end of the time limit for the application or the submission of a tender specified in the notice;
4) More than 15 calendar days have expired since receipt of notification from the contracting authority that it is unwilling to redress the objection.
Sentence 1 shall not apply to an application under § 135 (1) No 2 GWB to have the contract declared ineffective. § 134(1) sentence 2 GWB shall remain unaffected.